County Plan

The Trust has made responses to both the current and earlier withdrawn County Plan processes. This has comprised responses to the various stages of the plan making process:

  • issues and options
  • preferred options
  • pre-submission draft
  • examination in public conducted by an idependent Inspector, where the Trust has had a place at the table and been able to speak and answer the Inspector’s questions

This page is an archive of the Trust’s responses as the Local Plan has passed all the required stages and is now in operation.

INFORMATION BELOW IN PROGRESS

Main modifications

Examination in public

Pre-submission draft consultation

Preferred options consultation

Issues and options consultation

History of the withdrawn plan

Withdrawn Plan Pre-submision Draft consultation

Withdrawn plan Preferred Options Consultation