In addition to the new applications listed below, further responses were sent relating to the following applications:
DM/24/00705/FPA
Prince Bishops Shopping Centre High Street Durham DH1 3UJ
Redevelopment of existing shopping centre comprising partial demolition of the shopping centre above the existing mall level (Levels 5 and above) and erection of replacement commercial units (Class E), a hotel (Class C1) and purpose built student accommodation (Sui Generis) at Level 5 and above, along with a new outdoor public square and public realm improvements. External alterations to the boat repair and maintenance workshop including use of external areas to create outside terraces for leisure use (Levels 0 and 1) (Class E), external alterations to the elevations of the retained areas of the shopping centre and car park, hard and soft landscaping and other associated works.
Comment
DM/24/00821/FPA
Harrison House 1 Hawthorn Terrace Durham DH1 4EL
6no conservation style Velux windows installed to existing roof space.
Objection
DM/24/00876/TPO
East Durham And Houghall Community College Houghall Durham DH1 3SG
Removal of 5 trees and the pruning of 4 trees/shrubs
Objection
DM/24/00830/PN56
The Rectory The Village Brancepeth Durham DH7 8EL
Prior notification for the installation of ten solar panels on tilt racks
Objection
DM/24/00700/LB
26 North Bailey Durham DH1 3EW
Rainwater goods refurbishment to rectify water ingress with overhaul of existing box sash windows in shared lightwell, internal plaster repairs, re-pointing of gable and repairs to chimney stack
Support
DM/24/00917/LB
68 Hallgarth Street Durham DH1 3AY
Renovation of 2no front sliding sash windows
Support
DM/24/00894/LB
12 Church Street Durham DH1 3DQ
Installation of 1x432mm diameter, non-illuminated blue plaque on the front elevation
Support
DM/24/00827/LB
Porters Lodge The College Durham DH1 3EQ
Fabric repairs to external elevations including reconstruction, stone replacement, indents and repointing, dismantle battlemented parapet, install damp proof course and reconstruct existing stone. Remove failed roman cement render and provision of new roman cement render following repairs to substrate, paint windows following joinery repairs and dismantle parapet and roof covering
Support