Applications: Heritage

56 Claypath Conversion into Flats

DM/25/02401/LB

56 Claypath Durham DH1 1QS

Convert existing house into 4 flats, internal alterations to all floors, removal of one external rear door and demolition of external outhouses to rear garden. Installation of 2 conservation area rooflights to rear first floor roof

Objection

19 and 19A Silver Street HMO Extension Cafe Change of Use

DM/25/02307/FPA

19 And 19A Silver Street Durham DH1 3RB

Creation of an 8-bedroom HMO by enlarging and extending existing HMO, including change of use of vacant cafe.

Objection

26 Old Elvet Alterations Change of Use

DM/25/02344/FPA

26 Old Elvet Durham DH1 3HY

Change of use from seminar and lecture rooms (use class F1) to dwellinghouse (C3).

Comment

Beau View, Quarry House Lane – Variation

DM/25/02192/VOC

Beau View Quarry House Lane Crossgate Moor Durham DH1 4JA

Variation of condition 3 (approved plans) pursuant to planning permission DM/19/01912/FPA to allow for changes to extend the previously approved ground floor extension, creation of first floor with dormer window above and alterations to front porch.

Objection

Court Inn Court Lane External Lighting

DM/25/02016/FPA

Court Inn Court Lane Durham DH1 3AW

Ground floor external lighting

Objection

Court Inn, Court Lane, Signage

DM/25/01913/AD

Court Inn Court Lane Durham DH1 3AW

Externally illuminated fascia sign

Objection

The Deanery

DM/25/02174/FPA

The Deanery The College Durham DH1 3EQ

New compliant external ramped level access with associated landscape works; internal alterations to form accessibility ramp and associated alteration of door; removal of existing concrete sub-floor and installation of new limecrete heated floor; new north passage ceiling, removal of modern partitions.

Support

2 The College

DM/25/02136/LB

2 The College Durham DH1 3EQ

Carry out essential building maintenance work, introduce thermal upgrades to the building envelope, rationalise M&E installations, amend internal layout to incorporate an addition bedroom and new bathroom at first floor level, and introduce a conservation style rooflight.

Support