Amazon Wind Turbine

DM/25/00991/FPA

Amazon UK Services Unit 1 Integra 61 West Bowburn Durham DH6 5FG

Installation and operation of a single wind turbine generator (of up to 140m blade tip height and with an installed generating capacity of up to 2.3 megawatts) and associated infrastructure

Trust response Comment
Status Pending Consideration
Date validated 10/04/2025
Standard consultation start date 23/05/2025
Consultation expiry date 13/06/2025
Parish Cassop-cum-Quarrington
Ward Bowburn And Coxhoe

Submissions

Amazon-Wind-Turbine-2025-May-07

Links

1 comment

  1. Messagel
    We strongly object to the enormity of the structure, not only will it ruin the skyline, the light flicker and nature of the installation is not suitable near homes, we don’t object to an attempts for common sense, socially accepted environmental sustainability however the proposed structure is designed with no consideration for the local residents.