Amazon UK Services Unit 1 Integra 61 West Bowburn Durham DH6 5FG
Installation and operation of a single wind turbine generator (of up to 125m blade tip height and with an installed generating capacity of up to 1.85 megawatts) and associated infrastructure (Amended Height / Description).
| Trust response | Comment |
| Status | Decided (Refused) |
| Date validated | 10/04/2025 |
| Standard consultation start date | 04/06/2026 |
| Consultation expiry date | 17/06/2026 |
| Decision date | 29/07/2026 |
| Parish | Cassop-cum-Quarrington |
| Ward | Bowburn And Coxhoe |
Amazon-Wind-Turbine-2025-May-07
Messagel
We strongly object to the enormity of the structure, not only will it ruin the skyline, the light flicker and nature of the installation is not suitable near homes, we don’t object to an attempts for common sense, socially accepted environmental sustainability however the proposed structure is designed with no consideration for the local residents.